
How to Get Quotes from China Suppliers: A Sourcing Agent's Complete RFQ Guide
A few years ago, a first-time importer came to us with a puzzle. He had sent the same product inquiry — a simple one-liner asking “how much for 500 pcs?” — to ten factories on Alibaba. The quotes came back ranging from $2.10 to $6.80 per unit for what he believed was the same product. He assumed the cheap factory was the winner and the expensive ones were ripping him off.
He was wrong on both counts. The $2.10 quote was for a thinner-gauge material with a simpler finish. The $6.80 quote was for the specification he actually needed — and the factory had quietly priced in the certification his target market required. By the time he realized it, he had lost three weeks and nearly placed an order that would have failed compliance testing.
I’m Angel, CEO of SinoSourceAgent. I’ve spent more than ten years on the ground in China helping importers, Amazon FBA sellers, Shopify brands, and dropshippers buy from Chinese factories. If there is one skill that separates profitable buyers from frustrated ones, it’s this: knowing how to get quotes from China suppliers that are accurate, comparable, and actually worth negotiating on.
This guide is the complete RFQ (Request for Quotation) playbook I wish every buyer had before sending their first inquiry — what to prepare, how to structure your request, how to decode the quote you receive, and how to compare offers without getting burned.
Why Most Buyers Get Useless Quotes
Let’s be direct about the root cause: Chinese factories are not trying to confuse you. They are responding to the information you gave them. If your inquiry is vague, their quote will be vague — and every factory will interpret your words differently.
The three most common reasons quotes are useless:
1. The specification is incomplete. “Water bottle, 500 ml” tells a factory almost nothing. Is it Tritan, polypropylene, or stainless steel? Double-wall or single-wall? What lid design, what print method, what packaging? Each variable changes the cost by cents or dollars — and different factories will assume different defaults.
2. The quantity is unrealistic or unclear. Many factories quote a unit price based on their most efficient MOQ. If you ask for “500 pcs” but their MOQ is 3,000, the quote will either be inflated (to make the small order worth their time) or fictional (they’ll renegotiate when you place the order). A quote without a firm, honest quantity is a guess wearing a price tag.
3. You’re comparing apples to oranges. One factory quotes EXW (ex-works — you handle everything after the factory gate), another quotes FOB, another quotes DDP. One includes inner packaging, another doesn’t. One assumes a 25% deposit and 75% balance, another wants 50/50. Comparing the numbers without checking the terms is like comparing the price of a car with and without the wheels.
The good news? Every one of these problems is fixable on your end — before you click send. That’s what the rest of this guide is about.
Step 1: Prepare Before You Ask
The work that produces a great quote happens before you ever contact a supplier. In our experience, buyers who spend one hour preparing get quotes that are 20–40% more accurate and far easier to compare. Here’s what to assemble.
Your Product Specification Sheet
Write down everything a factory needs to quote accurately:
- Materials — exact material and grade where it matters (e.g., 304 stainless steel, not just “stainless steel”)
- Dimensions and tolerances — including a drawing or reference photo if you have one
- Colors — Pantone codes beat “blue” every time
- Surface finish and decoration — matte or gloss, printed or embossed, laser-etched or labeled
- Components — what comes in the box, from the product itself to cables, manuals, and accessories
- Packaging requirements — retail packaging, plain export cartons, or custom packaging; whether you need barcodes or warning labels
- Certifications — CE, FCC, RoHS, CPC, FDA, and others can add real cost and lead time, so state them up front
If you can’t fill in every field, that’s fine — say so. “We’re deciding between matte and gloss; please quote both” is a legitimate request. The factories will quote a range, and you’ll learn something about the cost of your options.
Your Volume and Timeline
Be honest about your order quantity and your target timeline. You don’t have to reveal your maximum budget — in fact, you shouldn’t. But the factory needs to know:
- Order quantity — and whether it’s a trial order or an annual volume broken into repeat orders. Factories price differently for one-off 500-unit orders versus 500 units per month for a year.
- Target delivery date — production lead time plus freight transit time determines whether your deadline is realistic.
- Seasonality — if you’re ordering during the months before Chinese New Year, every factory will quote higher lead times, and some will decline rush orders entirely.
Your Target Market
Tell the factory where the product will be sold. The US, EU, UK, and Australia have different certification, labeling, and packaging requirements — and the factory’s compliance experience (or lack of it) directly affects your risk. A factory that has exported to your market before will quote more realistically and cause fewer surprises.
Step 2: Write an RFQ That Gets Real Answers
Now that you’re prepared, it’s time to write the actual request. A professional RFQ doesn’t need to be beautiful — it needs to be complete and structured. Here’s the template we use with clients, which you’re welcome to adapt:
Subject: RFQ — [Product name] — [Quantity] pcs — [Target market]
Hi [Name],
We are an importer based in [country] and are evaluating suppliers for [product]. Could you please provide a quotation for the following?
Product specification: [attach your spec sheet or paste the key points]
Quantity: [X] pcs (first order). Expected annual volume: [Y] pcs in [N] shipments.
Target market: [e.g., US / EU / UK], so we will require [certifications] if applicable.
Please quote on the following basis:
- Unit price EXW / FOB [port] / CIF [port] / DDP [destination] — please quote at least FOB and DDP
- MOQ and price breaks at [quantity 1], [quantity 2], [quantity 3]
- Production lead time and total lead time to [destination]
- Payment terms
- Sample cost and lead time
- Packaging details (inner and export carton)
We are finalizing our supplier shortlist this month and would appreciate your quotation by [date]. Please let me know if any information is missing.
Best regards, [Name]
A few rules that make this template work:
- Ask for at least FOB and DDP in the same quote. FOB gives you a clean factory-gate price for comparison; DDP shows you what the total landed cost would look like if the factory handles freight, insurance, and customs. The gap between them tells you a lot about the supplier’s logistics capability.
- Request price breaks. A quote for a single quantity is a snapshot. Price breaks at 1×, 3×, and 10× your initial order tell you how the factory’s costs scale — and give you negotiating room later.
- Set a deadline. “We are finalizing our shortlist by [date]” creates mild, honest urgency. Factories prioritize buyers who appear organized and decisive.
- Send the same RFQ to 5–10 suppliers. Not 50 — you’ll drown in responses. Five to ten gives you a real sample of the market without an unmanageable inbox.
Step 3: Decode the Quote You Receive
When the quotes come back, the numbers are only the beginning. Here’s what a professional reads in every line.
The Price Basis (Incoterms)
The single most important detail in a quote is the Incoterms basis — which party pays for what. If you’re not fully comfortable with EXW, FOB, CIF, and DDP, our full breakdown of Incoterms 2020 for importers walks through each one. The short version:
- EXW — cheapest-looking number, but you arrange and pay everything after the factory gate: trucking, export clearance, ocean or air freight, insurance, import clearance, and delivery.
- FOB — the price includes goods loaded onto the vessel at the named Chinese port. You pay ocean freight, insurance, and everything on the destination side.
- CIF — the price includes goods, ocean freight, and insurance to the destination port. You handle import clearance and inland delivery.
- DDP — the supplier delivers the goods to your door, duties and taxes paid. The most expensive-looking number, but also the most complete.
Rule of thumb: if the quote doesn’t state an Incoterms basis, it’s incomplete — ask for it before comparing anything.
MOQ and Price Breaks
Check whether the quoted unit price matches your requested quantity. Factories commonly quote a “starting price” at their MOQ, then adjust when they see your actual volume. If the MOQ is far above your order size, ask directly: “Our order is below your MOQ — what is your best price for this quantity, and what would be included?” Some factories will accommodate small orders at a premium; others won’t, and knowing that early saves everyone time.
Lead Times
A quote should include production lead time (factory production time) and total lead time (production plus freight). If a factory quotes an impossibly short lead time during peak season, that’s a red flag — they may be planning to source from a sub-factory or push your order to the back of the line. In our experience, 25–40 days for production is typical for most consumer goods, plus 15–35 days for sea freight depending on the route.
Payment Terms
Most Chinese factories will ask for a 30% deposit and 70% balance before shipment, or a similar split. Some will offer better terms to repeat customers. Watch for factories demanding 100% in advance — especially for the first order — and treat that as a serious warning sign. Payment terms belong in every quote comparison: a slightly higher unit price with safer payment terms is often the better deal.
Sample Cost and Lead Time
Every serious quote should include sample terms: the cost of the sample, whether it’s refundable against a production order, and how long it takes to make. If a factory is unwilling to discuss samples, treat the quote as theoretical. Samples are the cheapest insurance you’ll ever buy — and the natural next step after you shortlist suppliers.
Step 4: Compare Quotes Like a Professional
You now have 5–10 quotes. Resist the urge to sort by price and pick the cheapest. Here’s the comparison process we use for clients.
Build a Comparison Table
Create a table with one row per supplier and columns for: unit price (FOB and DDP), MOQ, production lead time, sample cost, payment terms, certifications offered, and any notes on what’s included or excluded. Force every quote into the same shape — that’s the only way to compare honestly.
Normalize the Basis
If one factory quotes FOB Shenzhen and another quotes CIF Los Angeles, convert both to the same basis before comparing. Your freight forwarder or logistics partner can give you a realistic freight estimate, or you can ask each factory to quote DDP to your door and compare those numbers directly. This is where a sourcing agent earns part of their fee: we normalize dozens of quotes a month and know which freight rates are realistic for which routes.
Look at Total Landed Cost, Not Unit Price
A $3.00 FOB unit price with a 25% import tariff and expensive small-parcel shipping can cost you more than a $3.50 unit with consolidated freight and the right HS classification. Unit price is one input, not the answer — freight, duty, and compliance costs belong in the same table.
Beware the Low-Price Trap
A quote 30% below every other quote is not a bargain — it’s a hypothesis. The most common explanations are thinner materials, lower-grade components, skipped certifications, or a factory that plans to negotiate the price up once you’re committed. When a quote looks too good, ask the factory to confirm the spec point by point, and request a pre-production sample before paying anything. If they push back on the sample, walk away.
Beware the Middleman Premium
Many “factories” on B2B marketplaces are actually trading companies. That’s not inherently bad — a good trading company with solid quality control can be a great partner — but you should know what you’re paying for. Ask directly: “Are you the manufacturer? If not, can you share your factory’s name and location?” A trading company that is honest about its role and can show you the actual factory is fine. One that dodges the question is a risk.
Step 5: What to Do With Your Shortlist
Once you have comparable quotes, the real work begins — and this is where buyers who rush to place an order pay the price of impatience.
Verify the supplier. A great quote from a fake or unstable factory is worse than no quote at all. Check the business license, confirm the factory actually exists at the stated address, and look at their export history. Our guide to China supplier verification covers exactly how to do this without flying to China.
Order samples — always. Never place a production order based on a quote and photos alone. Order the sample, test it against your spec sheet, and compare samples from at least two shortlisted factories side by side. Our complete guide to getting samples from China suppliers walks through the process, including how to handle sample costs and what to test.
Negotiate with information, not pressure. The cheapest quote in your table is not a weapon — it’s information. “Your quote is 18% above the best offer we have. What can you do on price, or what would you include at that price?” is a professional conversation. Factories respect buyers who know the market; they resent buyers who bluff. Our step-by-step guide to negotiating prices with Chinese suppliers has the full playbook.
Lock everything in writing. Once you’ve agreed on price, MOQ, lead time, and payment terms, put every detail in the purchase order — including the specification, the Incoterms basis, the inspection standard, and the remedies if the shipment doesn’t meet it. A verbal agreement in a WeChat chat is not a contract.
How a Sourcing Agent Changes the Game
Here’s the honest trade-off: everything in this guide is something you can do yourself. I’ve met brilliant DIY buyers who run flawless RFQ processes from their kitchen tables. But doing it well takes time, experience, and market knowledge — and most buyers only run a handful of RFQs per year, which means they never build the pattern recognition that separates good quotes from traps.
That’s where a professional partner earns their keep. When you work with SinoSourceAgent, you’re not paying us to send emails — you’re paying for the thousands of RFQs we’ve processed, the factory relationships that let us know which quotes are realistic before we forward them, the normalization work that makes every comparison apples-to-apples, and the willingness to tell you when a “great deal” is actually a trap. We’ve seen the $2.10 quotes and the $6.80 quotes for the same product, and we know which factory is telling the truth.
The cost of a sourcing agent — typically a small commission or project fee — is usually dwarfed by the money saved on the first order alone: better pricing, fewer compliance surprises, and no catastrophic “savings” that turn into losses at customs.
Conclusion: The RFQ Is a Conversation, Not a Form
Getting quotes from China suppliers is the first real test of your sourcing skills. Do it badly and you’ll chase phantom prices, compare incomparable offers, and make decisions on noise. Do it well and you’ll have a clean shortlist, real numbers, and the foundation for negotiation — plus the confidence that comes from knowing your supplier choices are based on facts, not luck.
Prepare before you ask. Write a structured RFQ. Decode the terms behind every number. Compare on total landed cost, not unit price. Verify the supplier and order samples before you commit. And if you’d rather have a team that does this every day handle it for you — our doors (and our inbox) are open. Send us your product idea and we’ll come back with a realistic RFQ plan and honest pricing, the same way we’d want it done for us.